Core Services: Storm Water and Water Quality | Wastewater Collection Systems | Construction Oversight and Management

Projects

Representative listing of SDE projects over the past eight years.

Ongoing

Dates indicate the year in which the project commenced.

  • Illicit Connection Detection and Elimination (IDDE), Watertown, MA (2007)
  • Citywide Illegal Connection Investigation/Phase 3, Boston, MA (2012)
  • Illicit Discharge Detection and Elimination, Lawrence, MA (2012)
  • Analysis of Infiltration and Inflow in the Wastewater Collection System, Boston, MA (2015)
  • Water Meter Replacement and AMR System, Lowell, MA (2015)
  • Charles River Surface Water Quality Sampling, Watertown, MA (2014)
  • Construction Services for Annual Town Contracts, Watertown, MA (2015)
  • Stormwater Outfall Sampling, Newton, MA (2015)
  • Illicit Connection Detection and Elimination (IDDE), Springfield, MA (2015)
  • Phase 2 Wastewater Facilities Plan, Ridgefield, CT (2015)
  • Millham Water Treatment Plant Upgrades, Marlborough, MA (2015)
  • Stormwater Analysis, Design and Permitting for the Construction of Runway 5-23 Safety Areas at the at Lawrence Municipal Airport, North Andover, MA

2013/2014/2015 Completion

  • Sanitary Sewer Evaluation Survey (SSES), Lawrence, MA
  • Illicit Discharge Detection and Elimination (IDDE) Services, Medford, MA
  • Illicit Discharge Detection and Elimination (IDDE) Services, Everett, MA
  • Phase 2 Minute Man Air Field Stormwater Report, Stow, MA
  • Dye Testing at University of Connecticut, Storrs, CT
  • Replacement of Water Mains, Valves & Hydrants, Lawrence, MA
  • GPS Survey of Water Distribution System, Lawrence, MA
  • Water Meter Replacement and AMR System, Lawrence, MA
  • Construction Inspection Services for Gables Arsenal Street Project (Sewer, Drain and Water Main), Watertown, MA
  • Facilities Plan – Phase 2 Manhole Inspections, Enfield, CT
  • Installation, Removal and On-Call Maintenance of Flow Meters, Concord, MA
  • I/I Investigations for the Farmington River Sewershed – Manhole Inspections, Avon, CT
  • Dawson Avenue I/I Study Area Manhole Inspections, West Haven, CT
  • IDDE Technical Support, Quincy, MA
  • Construction Inspection Services for the Edenfield Avenue Water Main Replacement Project, Watertown, MA
  • Construction Inspection Services for the Fifield Street Water Main Replacement Project, Watertown, MA
  • MWRA Reading Extension Sewer and Metropolitan Sewer Rehabilitation Stoneham, Woburn and Wakefield, MA
  • Lynn Reservoir Cover Replacement – Sampling and Administrative Services, Lynn, MA
  • Engineering Services for Design of Sewer Separation of the Roxbury Canal Sewer and Adjacent Areas, Roxbury, MA
  • Sewer Collection System Improvements – Contract II, Lawrence, MA
  • Stage Harbor Pumping Station Improvements and Collection System Extension Construction Phase Services, Chatham, MA
  • Professional Engineering Services for Contract 2011-31 South Maple Avenue, MDC, Hartford, CT
  • Sewer System Evaluation Survey (SSES), Derby, CT
  • Sewer System Evaluation Survey (SSES), Stafford, CT
  • WWTF and Pump Station Improvements, Billerica, MA
  • Sump Pump Amnesty Program, Waltham, MA
  • Redundant Transmission Main Project Resident Project Representative Services, Lowell, MA
  • CSO Long Term Control Plan Implementation Project Phase 3, Newport, RI
  • Phosphorus Removal and Flood Control Mitigation Resident Project Representative Services, Warwick, RI
  • Sanitary Sewer Evaluation Survey (SSES), South Windsor, CT
  • Phase I Wastewater Facilities Plan – Ridgefield, CT
  • DCR Pleasant Street/Park Avenue Hydraulic Study, Worcester, MA
  • Lake Avenue Pump Station Area Sewer System I/I Rehabilitation Project – Phase I, Worcester, MA
  • Combined Sewer Separation Resident Inspection During Sewer Lining, Fitchburg, MA
  • CSO 005/006 Screening and Disinfection Facility – CSO Sampling, Nashua, NH
  • Sewer System Evaluation, Worcester, MA
  • Phase II Infiltration/Inflow Collection System Improvements, East Haven and Hamden, CT
  • Manhole Inspections, Woodstock, CT
  • Holway Street Water Main Construction Phase Services, Chatham, MA
  • Storm Drainage Investigation Services, Holliston, MA
  • Internal and External Building Inspections for Mini System “P” SSES Project, Medford, MA
  • Facilities Plan, Boston, MA
  • Fort Point Channel Hydraulic Evaluation and Water Quality Assessment, Boston, MA
  • Industrial Facility Storm Water Pollution Prevention Program, Boston, MA
  • Water Meters and Automatic Meter Reading System, Lawrence, MA
  • Lawton Valley Water Treatment Facility and Station One Water Treatment Facility, Newport, RI
  • Environmental Compliance Officer, Saugus, MA
  • Massachusetts Regional Stormwater Management Training Seminar Series
  • Outfall Inventory and Water Quality Sampling, Webster, MA

2010/2011/2012 Completion

  • Citywide Illegal Connection Investigation/Phase 2, Boston, MA
  • Dorchester Interceptor Inflow Relief Project, Boston, MA
  • Narragansett Bay Commission Hydraulic Modeling, RI
  • East Framingham Sewer Improvements Project, Framingham, MA
  • Oak Street Reconstruction, Natick, MA
  • MassDOT Winter Storm Monitoring, MA
  • Dunkirk Avenue/Mower Street Sewer Rehabilitation, Worcester, MA
  • Water Main Replacement, Haverhill, MA
  • Private Property Inflow Survey, Westborough, MA
  • Private Property Inflow Survey, Medford, MA
  • Private Property Inflow Survey, Fairhaven, MA
  • Huron A, B/Contract 9 Sewer Separation Project, Cambridge, MA
  • Illicit Discharge Detection and Elimination and Inflow Source Identification, Waltham, MA
  • Wastewater Treatment Plant Upgrades, Pittsfield, MA
  • Pump Station/Water Main Construction, Lunenburg, MA
  • Inflow/Infiltration Sewer System Evaluation Survey, Bristol, CT
  • Sewer System Evaluation Survey, Southington, CT
  • Infiltration/Inflow Detection Program and Illicit Connection Removal, Whitman, MA
  • Franklin Avenue Sewer Separation/Upper Franklin Area Projects, MDC, Hartford, CT
  • Hartford Area Building Disconnection Project, MDC, Hartford, CT
  • Infiltration/Inflow Study Phase II, Montville, CT
  • Downspout Disconnection Program, Springfield Water and Sewer Commission, Springfield, MA

2007/2008/2009 Completion

  • Water Main Replacement, Amesbury, MA
  • Illicit Connection Detection, Everett, MA
  • Michaud, Cypress, Ransom Pumping Stations, Framingham, MA
  • Wood Avenue Gravity Sewer Replacement, Framingham, MA
  • Water Main Replacement, Bridgewater, MA
  • Illicit Connection Detection, Medford, MA
  • Inflow/Infiltration Study, Tyngsborough, MA
  • Comprehensive Wastewater Management Plan, Granby, MA
  • Sewer System Evaluation Survey, Meriden, CT
  • Inflow and Infiltration Study, Southbridge, MA
  • Plains Area Sewer Project, Easthampton, MA
  • Stormwater Management Plan, Beaver Dam Brook/Farm Pond, Framingham, MA
  • Private Property Inflow and Infiltration Inspection, Newington, CT
  • Private Property Inflow and Infiltration Inspection, West Hartford, CT
  • Water Treatment Plant and Water Main Construction, East Bridgewater, MA
  • Storm Water Sampling, Boston University, Boston, MA
  • Saugus Sewer Rehabilitation, Saugus, MA
  • Private Property Inflow and Infiltration Survey, Saugus, MA

Boston Water and Sewer Commission

Since 2001, SDE has worked on numerous projects for the Boston Water and Sewer Commission. The following is a list of those projects, some of which are ongoing. Dates indicate the year in which the project commenced.

  • Citywide Illegal Connection Investigation/Phase 3, Boston, MA (2012)
  • Analysis of Infiltration and Inflow in the Wastewater Collection System, Boston, MA (2015)
  • Facilities Plan, Boston, MA
  • Fort Point Channel Hydraulic Evaluation and Water Quality Assessment, Boston, MA
  • Industrial Facility Storm Water Pollution Prevention Plan, Boston, MA
  • Pump Stations Assessment, Boston, MA
  • Roxbury Canal Sewer Separation Project
  • Citywide Illegal Connection Investigation/Phase 2
  • Dorchester Interceptor Inflow Relief Project
  • Storm Water Quality Monitoring Program
  • South Boston – North Dorchester/Lower Roxbury Sewer Separation
  • Reserved Channel Sewer Separation Project
  • Bulfinch Triangle Sewer Separation Project
  • Lower Dorchester Brook Sewer Study
  • West Roxbury Low Level Sewer Inflow/Infiltration Investigation
  • Citywide Illegal Connection Investigation/Phase 1
  • Stony Brook Illegal Connection Investigation
  • Granite Avenue Inflow and Infiltration Survey
  • Inflow Survey for Large Impervious Areas and Large Flat Roof Buildings
  • Interceptor Metering Project
  • Dorchester Brook High Level Sewer